Primary Department: Flood Control District
Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): E501-03-00-E001
Vendor/Entity Legal Name (if applicable): A Morfin Trucking, LLC
MWBE Contracted Goal (if applicable): 13.35%
MWBE Current Participation (if applicable): 0%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of change in contract No. 1 with A Morfin Trucking, LLC, for the Yale Stormwater Detention Basin, adding 38 calendar days and resulting in an addition of $258,590 to the contract amount (White Oak Bayou Watershed, Bond ID F-09, Project ID E501-03-00-E001, Job No. 24/0350, Precinct 2, MWBE Contracted Goal: 13.35%).
end
Background and Discussion:
The Yale Stormwater Detention Basin is located southeast of the intersection at W. Tidwell Road and Yale Street, in the White Oak Bayou Watershed. This project, along with future improvement projects, will help remove the 500-year area of inundation from an estimated 2,815 structures, 2,520 acres of land and 82.8 miles of roadway. The Yale Stormwater Detention Basin project includes a wet bottom detention basin with an inflow side weir and flap gate outfall pipe, adjacent to E101-00-00 (Little White Oak Bayou).
The purpose of this Contract Change is to increase quantities for demolition pay items of remove and
dispose of driveways and sidewalks, asbestos pipe removal, remove and dispose of manholes and
inlets, as well as flowable fill to plug existing channel outfall piping. Due to the significant overgrowth
of vegetation on site the existence of these ite...
Click here for full text