File #: 25-2943    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 4/28/2025 In control: Commissioners Court
On agenda: 5/8/2025 Final action: 5/8/2025
Title: Request for approval of an award on the basis of lowest bid meeting specifications to Greater Houston Construction LLC in the amount of $1,347,661 for concrete channel lining repairs of Spring Branch Creek from Bracher Street to Pech Road for the Flood Control District, and for the County Clerk to execute any applicable bonds to be received (250066), MWBE Contracted Goal: 19.84%.
Primary Department: Purchasing
Primary Department Head/Elected Official: Paige McInnis

Secondary Department: Flood Control District
Secondary Department Head/Elected Official: Tina Petersen

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

Project ID (if applicable): 250066
Vendor/Entity Legal Name (if applicable): Greater Houston Construction LLC

MWBE Contracted Goal (if applicable): 19.84%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

Request Summary (Agenda Caption):
title
Request for approval of an award on the basis of lowest bid meeting specifications to Greater Houston Construction LLC in the amount of $1,347,661 for concrete channel lining repairs of Spring Branch Creek from Bracher Street to Pech Road for the Flood Control District, and for the County Clerk to execute any applicable bonds to be received (250066), MWBE Contracted Goal: 19.84%.
end

Background and Discussion:
Spring Branch Creek is located in central Harris County in Precinct 3 and is owned by HCFCD. This creek provides stormwater drainage for the Spring Branch and Spring Valley Village area and conveys it to Buffalo Bayou. An inspection performed in 2019 revealed damage to the concrete at many expansion joints, voids beneath the concrete, and damaged outfalls. This project is intended to repair these items and restore the channel to the original condition. This project is funded by Tax Revenue, FCD

Expected Impact:
The intent of this contract is to rehabilitate the concrete lining of the channel and related outfalls to repair damage and return them to the original design conditions.