Title: Transmittal by the Office of the County Engineer of the change to the electric meter ESID number from 1008901025001857270121 to 1008901025005194260125 for Carpenters Bayou - Trails and Pedestrian Bike Bridge, UPIN 19101MF0YC01, Precincts 1 and 2.
Attachments: 1. 25-2149-TRANSMITTAL-UPIN 19101MF0YC01- Carpenters Bayou - Trails and Pedestrian Bike Bridge - SOLS 15731.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Transmittal

Project ID (if applicable): Job No. 24/0107, UPIN 19101MF0YC01
Vendor/Entity Legal Name (if applicable): CenterPoint Energy Houston Electric, LLC

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Transmittal by the Office of the County Engineer of the change to the electric meter ESID number from 1008901025001857270121 to 1008901025005194260125 for Carpenters Bayou - Trails and Pedestrian Bike Bridge, UPIN 19101MF0YC01, Precincts 1 and 2.
end

Background and Discussion:
Harris County proposes the construction of a sidewalk along Wallisville Road from Beltway 8 to Hidden Park Drive and
provide new crosswalks at Wallisville Road and at Carpenters Landing Way. A traffic signal warrant analysis was completed for the intersection of Wallisville Road at Carpenters Landing Way, in front of Aguirre Junior High School.

Expected Impact:
In issuing the new ESID number, CenterPoint Energy Houston Electric, LLC will be able to assign an account to the County for electric service to the traffic signal. The signal will be energized with a valid account for quantifying the consumption
of electric charge.

Alternative Options:
No alternative option. Electric service is required for the traffic signal to function.

County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.