Legislation Details

File #: 25-1954    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 3/17/2025 In control: Commissioners Court
On agenda: 3/27/2025 Final action: 3/27/2025
Title: Request for approval to execute an agreement with All-Terra Engineering, Inc. in the amount of $388,590.00 for Professional Engineering Services regarding Construction Materials Testing and related Services for Drainage Improvements at Parkway (Mobile Homes - 2018) Subdivision, UPIN 19101MF17F01, Precinct 1, MWBE Contracted Goal: 100%.
Sponsors: Mony Hossain
Attachments: 1. 25-1954-Award-UPIN 19101MF17F01-All-Terra Engineering, Inc.-Parkway (Mobile Homes – 2018) Sub -P1-3272025
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer


Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

Project ID (if applicable): UPIN 19101MF17F01; Job No. 25/0039
Vendor/Entity Legal Name (if applicable): All-Terra Engineering, Inc.

MWBE Contracted Goal (if applicable): 100%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with All-Terra Engineering, Inc. in the amount of $388,590.00 for Professional Engineering Services regarding Construction Materials Testing and related Services for Drainage Improvements at Parkway (Mobile Homes - 2018) Subdivision, UPIN 19101MF17F01, Precinct 1, MWBE Contracted Goal: 100%.
end

Background and Discussion:

The Parkway (Mobile Homes) Subdivision is located in Precinct 1, northeast Harris County, north of the intersection of Park Trail Drive and Tidwell Road. The existing drainage system consists of concrete curb and gutter, and surface flow to a main trunkline drainage culvert that runs south and ultimately outfalls into HCFCD maintained ditch P122-00-00. The scope of project includes construction of underground drainage improvements, stormwater detention basin, and concrete pavement. All-Terra Engineering will provide construction materials testing services to support the project in construction.





Expected Impact:

This agreement will allow the firm to conduct field and laboratory testing on soil, concrete, asphalt and various other construction materials to ensure the material's compliance with Harris County Engineering Depar...

Click here for full text