Title: Request for approval of an amendment to an agreement with Binkley and Barfield Inc. in the amount of $669,590.00 for additional On-Call - Professional Services and to add a survey subconsultant in connection with various projects, UPIN 24101MF39T01, Precinct 1, MWBE Contracted Goal: 19.6%.
Attachments: 1. 25-1900-CIC-UPIN 24101MF39T01 -Binkley and Barfield Inc.-On-Call Proffesional Services-P1-3272025
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): UPIN 24101MF39T01
Vendor/Entity Legal Name (if applicable): Binkley and Barfield, Inc.

MWBE Contracted Goal (if applicable): 19.6%
MWBE Current Participation (if applicable): 0%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of an amendment to an agreement with Binkley and Barfield Inc. in the amount of $669,590.00 for additional On-Call - Professional Services and to add a survey subconsultant in connection with various projects, UPIN 24101MF39T01, Precinct 1, MWBE Contracted Goal: 19.6%.
end

Background and Discussion:
Professional On-Call Engineering Services is needed for water and wastewater projects at various locations within Harris County, Precinct 1. This amendment adds a survey subconsultant and increases the amount of the On-Call Professional Services Agreement by $669,590.00, for a total of $909,590.00. The increase in funding is for the design of the replacement of the failing water system in Alexander Deussen Park.

Expected Impact:
The failing water system in Alexander Deussen Park can be re-designed and replaced.

Alternative Options:
If the increase is not approved, then the failing water system will not be replaced, and the Precinct will continue to incur high maintenance costs due to numerous water leaks of the aging water system.

County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.