Legislation Details

File #: 25-1873    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 3/14/2025 In control: Commissioners Court
On agenda: 3/27/2025 Final action: 3/27/2025
Title: Request for approval of an award on the basis of low bid to G.A.M. Construction Inc in the amount of $902,044 for office building renovations at 1310 Prairie for the Office of the County Engineer, and for the County Clerk to execute any applicable bonds to be received (240398), MWBE Contracted Goal: 19.04%.
Primary Department: Purchasing
Primary Department Head/Elected Official: Paige McInnis

Secondary Department: County Engineer
Secondary Department Head/Elected Official: Milton Rahman

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

Project ID (if applicable): 240398
Vendor/Entity Legal Name (if applicable): G.A.M. Construction Inc

MWBE Contracted Goal (if applicable): 19.04%
MWBE Current Participation (if applicable):
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

Request Summary (Agenda Caption):
title
Request for approval of an award on the basis of low bid to G.A.M. Construction Inc in the amount of $902,044 for office building renovations at 1310 Prairie for the Office of the County Engineer, and for the County Clerk to execute any applicable bonds to be received (240398), MWBE Contracted Goal: 19.04%.
end

Background and Discussion:
The 1310 Prairie Renovations include asbestos testing, proper disposal of asbestos containing material and the renovation of the 9th and 12th floors of the 1310 Prairie location. The project includes the renovation of approximately 4,790 SF of interior space on the 9th floor and approximately 8,712 SF of interior space on the 12th floor to include life safety fire code compliance, interior demolition, millwork, finishes, lighting, reconfiguring of the mechanical, electrical and plumbing systems, and signage.

Expected Impact:
Construction renovation of the 9th and 12th floors of the 1310 Prairie Building would allow for more space to accommodate the expected personnel in the Public Defender's Office.


Alternative Options:
Award a higher bidder which would increase cost and possibly prolong the start of the renovation.

County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-...