Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official:
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): 20104MF1BP01
Vendor/Entity Legal Name (if applicable): KUO & ASSOCIATES INC
MWBE Contracted Goal (if applicable): 19.6%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of an amendment to an agreement with KUO & ASSOCIATES INC in the amount of $57,511.00 for Professional Engineering Services to provide improvements to Northpointe Boulevard Segment 1 - from Grant Road to Shaw Road - 2019, UPIN 20104MF1BP01, Precinct 3, MWBE Contracted Goal:19.6%.
end
Background and Discussion:
This project is located at Northpointe Boulevard in Precinct 3. This project will be extending Northpointe Boulevard from Grant Road to Shaw Road. The project includes dual 930' bridges that spans the floodway and two 16 acre detention basins.
Expected Impact:
This amendment will be proposing the extension of Northpointe Boulevard by providing a 4-lane concrete boulevard with 32 foot raised median within a 100' ROW and a dual bridges over the Faulkey Gully channel floodway.
Alternative Options:
An alternative would be not to construct the extension of Northpointe Boulevard.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/...