Legislation Details

File #: 25-1709    Version: 1 Name:
Type: Transmittal Status: Accepted
File created: 3/12/2025 In control: Commissioners Court
On agenda: 3/27/2025 Final action: 3/27/2025
Title: Transmittal by the Flood Control District of a preliminary engineering report by Woolpert, Inc., dated January 1, 2025, and titled Keegans Bayou Drainage Improvements near Beltway 8 and West Airport Road (Brays Bayou Watershed, Bond ID F-07, Project ID D118-02-00-E001, Precinct 4).
Attachments: 1. Map.pdf
Primary Department: Flood Control District
Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Transmittal

Project ID (if applicable): D118-02-00-E001
Vendor/Entity Legal Name (if applicable): Woolpert, Inc.

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Transmittal by the Flood Control District of a preliminary engineering report by Woolpert, Inc., dated January 1, 2025, and titled Keegans Bayou Drainage Improvements near Beltway 8 and West Airport Road (Brays Bayou Watershed, Bond ID F-07, Project ID D118-02-00-E001, Precinct 4).
end

Background and Discussion:
The purpose of the Preliminary Engineering Report (PER) was to provide reduced risk for structural flooding within the Brays Bayou watershed, specifically along D118-02-00. The project consists of the construction of storm sewer improvements through Glenshire Subdivision beginning south/west of Beltway 8 with 8'x4' RCB across Beltway 8 to a wet bottom detention basin which mitigates the increased flow along D118-02-00. A community engagement meeting was held November 6, 2024. The Flood Control District plan to utilize the remaining funds in Bond ID F-07 to design and construct both the storm sewer improvements and the mitigation basin. The purpose of this transmittal is to receive approval of a preliminary engineering report

Expected Impact:
The acceptance of this PER will allow the Flood Control District to continue to work toward achieving the overall benefit of this project which is to reduce flood risks for the Brays Bayou wat...