Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): UPIN: 19103MF17E01
Vendor/Entity Legal Name (if applicable): R.G. Miller Engineers, Inc.
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): 24.81%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of an amendment to an agreement with R.G. Miller Engineers, Inc. in the amount of $63,645.00 for Professional Engineering Services in connection with Timberlake Estates Subdivision Drainage Improvements - 2018, UPIN 19103MF17E01, Precinct 3, MWBE Current Participation: 24.81%.
end
Background and Discussion:
The project is located in northwest Harris County, primarily in the White Oak Bayou watershed and partially in the Cypress Creek watershed. It is north of Cypress North Houston Road, east of Huffmeister Road, and west of N. Eldridge Parkway. Timberlake Estates consists of roadside ditches that drain into HCFCD channel K163-00-00. The proposed improvements are to regrade the roadside ditches, install storm sewer system beneath roadside ditches, convert an amenity basin into a detention basin and connect the basin to the drainage system for mitigation.
Expected Impact:
This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the Timberlake Estates subdivision.
Alternative Options:
The County could elect to fund the requested task or choose to reject it. However, if not approved, the co...