Legislation Details

File #: 25-1624    Version: 1 Name:
Type: Donation Status: Passed
File created: 3/11/2025 In control: Commissioners Court
On agenda: 3/27/2025 Final action: 3/27/2025
Title: Request for approval for County of Harris to accept a real estate donation of a 0.0001-acre road easement and the County Judge execute a proposed gift form, tract number 2, for the public project known as Birnam Wood Blvd Segment 1 - from 450' north of Hickorygate Dr to south of J109-01-01 - 2019, from Gil E. Soto and Vivian V. Soto, with the HCAD value of $3.28, UPIN 20104MF1BG01, Precinct 3.
Attachments: 1. 25-1624-(Donation)20104MF1BG01-BirnamWoodSeg1-P3-3-27-25
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: Not applicable

Regular or Supplemental RCA: Regular RCA

Type of Request: Donation

Project ID (if applicable): 20104MF1BG01
Vendor/Entity Legal Name (if applicable): Gil E. Soto and Vivian V. Soto

MWBE Contracted Goal (if applicable): Not applicable
MWBE Current Participation (if applicable): Not applicable
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): Not applicable
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval for County of Harris to accept a real estate donation of a 0.0001-acre road easement and the County Judge execute a proposed gift form, tract number 2, for the public project known as Birnam Wood Blvd Segment 1 - from 450' north of Hickorygate Dr to south of J109-01-01 - 2019, from Gil E. Soto and Vivian V. Soto, with the HCAD value of $3.28, UPIN 20104MF1BG01, Precinct 3.
end

Background and Discussion:
This is a road project, the scope consists of extension of Birnam Wood Boulevard from north of Hickorygate Drive to south of Indigo Forest Boulevard, standard four (4) lane concrete boulevard in 100-ft right of way with 32-ft raised medians. This project expansion needs the acquisition of some parcels as part of the visibility design per Harris County Traffic Standards.

Expected Impact:
The acquisition of this parcel will ensure that Harris County has the proposed ROW needed to comply with Harris County Traffic Standards and Design documents to improve the existing 2-lane Boulevard to a 4-lane Boulevard.

Alternative Options:
If this request is not approved, the project will not be sent to bid due the missing ROW, and no construction will be initiated there...