Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): UPIN 24103MF3GA01
Vendor/Entity Legal Name (if applicable): R.G. Miller Engineers, Inc.
MWBE Contracted Goal (if applicable): 19.60%
MWBE Current Participation (if applicable): 0%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with R.G. Miller Engineers, Inc. in the amount of $1,477,193.10 for Professional Engineering Services in connection with the design of Road Improvements - Garth Rd 2 South of Sterling Summer Dr to Ashbel Cove Dr - 2024, UPIN 24103MF3GA01, Precinct 3, MWBE Contracted Goal: 19.60%.
end
Background and Discussion:
The project is located in east Harris County, north of I-10. The existing Garth Road configuration in the project area ( South of Sterling Summer Dr to Ashbel Cove Dr) is a 2-lane asphalt roadway with roadside ditches with a 2-lane bridge with no shoulder or sidewalk over the Coastal Water Authority raw water canal. The goal of the project is to design and construct a standard 4-lane concrete boulevard with curb and gutter and to widen the canal crossing bridge to 4-lanes with pedestrian sidewalk.
Expected Impact:
The proposed project will increase the traffic capacity for the active development in this area, as well as improve driver safety at the intersection with FM 1942. The project is funded by 2022 Bond funds.
Alternative Options:
Without this project, the new road improvements on Garth Road will not be realized as requested by Precinct