Legislation Details

File #: 25-1566    Version: 1 Name:
Type: SOLS Status: Passed
File created: 3/11/2025 In control: Commissioners Court
On agenda: 3/27/2025 Final action: 3/27/2025
Title: Request for approval to execute a Letter of No Objection with ONEOK NGL Distribution System, L.L.C regarding the proposed sidewalk crossing the existing 10" Easton Energy Pipeline in connection with the Uvalde Road project from Wallisville Road to Holly Park Drive, UPIN 23102MF2QS01, Precinct 2.
Sponsors: Mony Hossain
Attachments: 1. 25-1566-UA-UPIN#23102MF2QS01_Sidewalk - Uvalde Rd from Wallisville Road to Holly Park Drive-RCA.pdf
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Utility Agreement

Project ID (if applicable): UPIN 23102MF2QS01
Vendor/Entity Legal Name (if applicable): ONEOK NGL Distribution System, L.L.C.

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute a Letter of No Objection with ONEOK NGL Distribution System, L.L.C regarding the proposed sidewalk crossing the existing 10" Easton Energy Pipeline in connection with the Uvalde Road project from Wallisville Road to Holly Park Drive, UPIN 23102MF2QS01, Precinct 2.
end

Background and Discussion:
Uvalde Road is located in Harris County Precinct 2. The project generally proposes a 6-foot sidewalk on both sides of Uvalde Road, from Wallisville Drive to Holly Park Drive, totaling 10,044 linear feet of sidewalk. A section of the proposed sidewalk crosses the 10" Easton Energy Pipeline, and Harris County has requested a Letter of No Objection. ONEOK (Easton Energy Pipeline) has agreed to provide the Letter of No Objection but has requested a signed copy from the Commissioners' Court.

Expected Impact:
This action allows the continuation of the contracted work.


Alternative Options:
No action will result in substandard construction.

County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control,...