Legislation Details

File #: 25-1510    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 3/6/2025 In control: Commissioners Court
On agenda: 3/27/2025 Final action: 3/27/2025
Title: Request for approval of a change in contract with DT Construction, LP, in connection with Harris County Pollution Control Services Renovation, located at 101 S. Richey St., Suite H., Pasadena, TX 77506, adding 60 calendar days, with an addition in the amount of $62,824.52, Job No. 22/0283, UPIN 21272MF22601, Precinct 2, MWBE Contracted Goal: 15.2%, MWBE Current Participation: 11.54%.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: Choose an item.
Secondary Department Head/Elected Official:

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): 22/0283
Vendor/Entity Legal Name (if applicable): DT Construction

MWBE Contracted Goal (if applicable): 15.2%
MWBE Current Participation (if applicable): 11.54%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of a change in contract with DT Construction, LP, in connection with Harris County Pollution Control Services Renovation, located at 101 S. Richey St., Suite H., Pasadena, TX 77506, adding 60 calendar days, with an addition in the amount of $62,824.52, Job No. 22/0283, UPIN 21272MF22601, Precinct 2, MWBE Contracted Goal: 15.2%, MWBE Current Participation: 11.54%.
end

Background and Discussion:
This project was approved on Commissioners Court on 10/13/2020. Improvements include interior renovation of the office suite, adding emergency shower drains, and upgrading the laboratory suite to 100% operational during a disaster event, which includes a water tank for domestic water and a new 1000 kW emergency generator for electricity.

This change in contract provides an Emergency Power Off for the complex which was demanded by City of Pasadena Fire Marshall Office plus an additional 60 calendar days to the construction schedule.

Expected Impact:
Upon completion of the project, Harris County Pollution Control Services will be able to maintain full operations during major disaster and storm events. The requested changes allow the completion of the project in accordance with the original intent of the...