Legislation Details

File #: 25-1503    Version: 1 Name:
Type: Utility Agreement Status: Passed
File created: 3/6/2025 In control: Commissioners Court
On agenda: 3/27/2025 Final action: 3/27/2025
Title: Request for approval to execute a Utility Agreement with Houston Pipe Line Company LP in connection with Roland Road and Related Infrastructure Drainage Improvements - 2022, UPIN 19103MF14C01, Precinct 4.
Attachments: 1. 25-1503-UA-UPIN 19103MF14C01-Roland Road-Houston Pipeline-P4-v01
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Utility Agreement

Project ID (if applicable): UPIN 19103MF14C01
Vendor/Entity Legal Name (if applicable): Houston Pipe Line Company LP

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

Request Summary (Agenda Caption):
title
Request for approval to execute a Utility Agreement with Houston Pipe Line Company LP in connection with Roland Road and Related Infrastructure Drainage Improvements - 2022, UPIN 19103MF14C01, Precinct 4.
end

Background and Discussion:
The Roland Road project is located in west Harris County in Precinct 4. The scope of work for this utility agreement includes stopple and bypass of a 30" pipeline, installation of 1,300' of 24" pipeline, and pigging, cleaning, cutting, and removing of an existing 30" pipeline by Trunkline. This agreement commits Harris County to reimbursing Houston Pipe Line for this work and allows Harris County to install drainage improvements to reduce future flood damage.

Expected Impact:
This project generally seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the community. This utility agreement specifically will allow Houston Pipe Line to remove obstacles and Harris County to reimburse Trunkline and install drainage improvements.

Alternative Options:
Alternative options would include redesign of the project to avoid the pipelines or abandonment of the project.

County Strategic Plan Goal: 2. Connect our com...