Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Report
Project ID (if applicable): UPIN - 23103MF2PH01
Vendor/Entity Legal Name (if applicable): IDS Engineering Group Inc
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a Study Report prepared by IDS Engineering Group Inc. for Corridor Study- Holzwarth Rd - from Cypresswood Dr to Spring Cypress Rd, UPIN 23103MF2PH01, Precinct 3.
end
Background and Discussion:
The Holzwarth Road corridor is in northwest Harris County and the roadway is classified as a major thoroughfare with high volumes of traffic. A significant number of accidents have been reported for portions of this corridor. After the contract amendment was approved for additional services for traffic engineering services related to median openings design and evaluation, now we have the final Study Report needed to proceed with this project.
Expected Impact:
The completion of this study of the Holzwarth Road corridor will allow the Precinct to evaluate future needs for separate design and construction projects along this corridor between Cypresswood Drive to Spring Cypress Road to increase safety and improve traffic conditions.
Alternative Options:
The alternative is to not approve the study report which will prevent future design projects.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.