Legislation Details

File #: 25-1337    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 2/20/2025 In control: Commissioners Court
On agenda: 3/5/2025 Final action: 3/5/2025
Title: Request for approval to execute an agreement with IDS Engineering Group, Inc. in the amount of $279,267.10 for Professional Engineering and related services in connection with Roadway Maintenance - Residential Asphalt Package Channelview - 2024, UPIN 24208MF3M801, Precinct 3, MWBE Contracted Goal: 1.85%.
Attachments: 1. Award-UPIN 24208MF3M801-PSA-Residential AsphPkg Channelview-2024-IDS Eng Group-P3-v03.pdf
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

Project ID (if applicable): UPIN - 24208MF3M801
Vendor/Entity Legal Name (if applicable): IDS Engineering Group, Inc.

MWBE Contracted Goal (if applicable): 1.85%
MWBE Current Participation (if applicable): 0%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with IDS Engineering Group, Inc. in the amount of $279,267.10 for Professional Engineering and related services in connection with Roadway Maintenance - Residential Asphalt Package Channelview - 2024, UPIN 24208MF3M801, Precinct 3, MWBE Contracted Goal: 1.85%.
end

Background and Discussion:
Precinct 3 is requesting the Office of the County Engineer to enter into an agreement for professional engineering services to provide the design of an asphalt roadway rehabilitation plan for 7.54 miles of various road in the Channelview within Precinct 3. The maintenance repair options include base repair, mill and overlay and other pavement repair options such as hot or cold in place recycling, if recommended by the design team.

Expected Impact:
The maintenance project will improve the road quality for the community in the specified area.

Alternative Options:
Without this project, the roads cannot be maintained properly. The goal is to provide better mobility and/or
eliminate hazards from the roadway as requested by the Precinct.

County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County ...