Legislation Details

File #: 25-1336    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 2/20/2025 In control: Commissioners Court
On agenda: 3/5/2025 Final action: 3/5/2025
Title: Request for approval of an award on the basis of low bid to Express Dump Truck Service of Houston LLC in the amount of $584,729 for general repairs to P118-32-01 for the Flood Control District, and for the County Clerk to execute any applicable bonds to be received (240428), MWBE Contracted Goal: 19.80%.
Primary Department: Purchasing
Primary Department Head/Elected Official: Paige McInnis

Secondary Department: Flood Control District
Secondary Department Head/Elected Official: Tina Petersen

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

Project ID (if applicable): 240428
Vendor/Entity Legal Name (if applicable): Express Dump Truck Service of Houston LLC

MWBE Contracted Goal (if applicable): 19.80%
MWBE Current Participation (if applicable):
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

Request Summary (Agenda Caption):
title
Request for approval of an award on the basis of low bid to Express Dump Truck Service of Houston LLC in the amount of $584,729 for general repairs to P118-32-01 for the Flood Control District, and for the County Clerk to execute any applicable bonds to be received (240428), MWBE Contracted Goal: 19.80%.
end

Background and Discussion: 118-32-01 is in northwest Harris County in Precinct 2. This channel provides stormwater detention and drainage for the West Mount Houston subdivision and conveys it to another tributary, P118-32-00, which outfalls to P118-00-00 (Halls Bayou). An inspection performed in 2019, and subsequently in 2022, revealed debris in the channel and silt in the reinforced concrete boxes. This project is intended to repair these items and restore the channel in form and capacity to the original design condition. This service will provide support for infrastructure maintenance work that will be executed as a result of the passage of the "Maintenance Matters" Proposition in November 2024.

Expected Impact: Work includes erosion repairs and sediment removal. Major emphasis of this repair contract will be earthwork, including but not limited to erosion repair, riprap installation, sediment removal, pipe installation, and related it...

Click here for full text