Legislation Details

File #: 25-1262    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 2/14/2025 In control: Commissioners Court
On agenda: 2/27/2025 Final action: 2/27/2025
Title: Request for approval of an award on the basis of low bids to A. Morfin Trucking LLC; and RES Gulf Coast, LLC dba LECON, Inc in the amount of $2,417,875 for concrete channel lining repairs (South) for the Flood Control District for the period of March 1, 2025 - February 28, 2026 with four (4) one-year renewal options, and for the County Clerk to execute any applicable bonds to be received (240426), MWBE Contracted Goal: 19.24%.
Primary Department: Purchasing
Primary Department Head/Elected Official: Paige McInnis

Secondary Department: Flood Control District
Secondary Department Head/Elected Official: Tina Petersen

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

Project ID (if applicable): 240426
Vendor/Entity Legal Name (if applicable): A. Morfin Trucking LLC; and RES Gulf Coast, LLC dba LECON, Inc

MWBE Contracted Goal (if applicable): 19.24%
MWBE Current Participation (if applicable):
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

Request Summary (Agenda Caption):
title
Request for approval of an award on the basis of low bids to A. Morfin Trucking LLC; and RES Gulf Coast, LLC dba LECON, Inc in the amount of $2,417,875 for concrete channel lining repairs (South) for the Flood Control District for the period of March 1, 2025 - February 28, 2026 with four (4) one-year renewal options, and for the County Clerk to execute any applicable bonds to be received (240426), MWBE Contracted Goal: 19.24%.
end

Background and Discussion: This Term Contract is for Infrastructure Repairs and consists of project work orders to include concrete channel lining repairs for projects located within the southern portion of Harris County, Texas. Major emphasis of the project work orders will be to concrete channel lining repairs, including but not limited to full panel replacement, concrete lining - partial depth with engineered ductal mortar (EDM), headwall/wingwalls repairs with EDM, disposal of sediment accumulations on concrete lined channels, filling voids behind concrete channel lining, light erosion repair with granular 3" X 5" fill and riprap installation, pipe removal and replacement, outfall structure removal and replacement, small sections of concrete channel lining removal and replacement and relate...

Click here for full text