Primary Department: Flood Control District
Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Transmittal
Project ID (if applicable): O100-00-00-E003
Vendor/Entity Legal Name (if applicable): N/A
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Transmittal by the Flood Control District of a preliminary engineering report for Channel Conveyance Improvements Along Goose Creek and Stormwater Detention Basin - Phase 1 prepared by Carollo, Inc., dated April 2023 (Spring Gully and Goose Creek Watersheds, Bond ID F-102, Project ID O100-00-00-E003, Precinct 2).
end
Background and Discussion:
The purpose of this project is to reduce flood risk in the Spring Gully and Goose Creek Watersheds by designing channel conveyance improvements along Goose Creek and a stormwater detention basin (SWDB).
Expected Impact:
The acceptance of this PER will allow the Flood Control District to move into the engineering stage of this project and finalize design so that the project can be publicly bid for construction.
Alternative Options:
The alternative to approving this item would be not approving this Preliminary Engineering Report, which would result in the Flood Control District not proceeding with the final design of this project.
County Strategic Plan Goal: 5. Minimize the impact of climate change and disasters.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A