Legislation Details

File #: 25-0940    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 1/25/2025 In control: Commissioners Court
On agenda: 2/6/2025 Final action: 2/6/2025
Title: Request for approval of a change in contract with Environmental Allies, Inc., in connection with final construction of Sidewalk - East Meyer Avenue - 2021, with a deduction in the amount of $99,505.83, Job No. 22/0430-2, UPIN 22102MF2BS01, Precinct 2, MWBE Contracted Goal: 21%, MWBE Current Participation: 25.98%.
Sponsors: Mony Hossain
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: Commissioner, Precinct 2
Secondary Department Head/Elected Official: Adrian Garc?a

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): Job No. 22/0430, UPIN 22102MF2BS01
Vendor/Entity Legal Name (if applicable): Environmental Allies, Inc.

MWBE Contracted Goal (if applicable): 21%
MWBE Current Participation (if applicable): 25.98%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Environmental Allies, Inc., in connection with final construction of Sidewalk - East Meyer Avenue - 2021, with a deduction in the amount of $99,505.83, Job No. 22/0430-2, UPIN 22102MF2BS01, Precinct 2, MWBE Contracted Goal: 21%, MWBE Current Participation: 25.98%.
end

Background and Discussion:
The project involves the construction of approximately 3,750 linear feet of sidewalk along East Meyer Avenue, extending from SH 146 to North Meyer Road in the City of Seabrook, located within Harris County Precinct 2. The sidewalk, designed to be 5 feet wide (with a minimum width of 4 feet) and 4 1/2 inches thick, will be constructed on the north side of South Meyer Avenue, at least 2 feet from the edge of the pavement.

This change in contract includes the final reconciliation of actual quantities used in construction against the bid quantities. Total = (-$99,505.83)

Expected Impact:
This action allows for unused funds to be returned to Harris County.

Alternative Options:
Action required to return unused funds.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, a...

Click here for full text