File #: 25-0876    Version: 1 Name:
Type: Financial Authorization Status: Passed
File created: 1/24/2025 In control: Commissioners Court
On agenda: 2/6/2025 Final action: 2/6/2025
Title: Request for approval to purchase a certain tract for a negotiated price for Harris County for the public project known as North Eldridge Parkway - from Spring Cypress Road to Gregson Road - 2015, tract number 2, for $750,000.00 which is $53,040.00 over the appraised value, UPIN 15104MF0D701, Precinct 3.
Attachments: 1. 25-0876-FA-UPIN 15104MF0D701-NEPkwy from Spring Cypress to Gregson Rd Tr.2-P3-02062025
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: Not Applicable

Regular or Supplemental RCA: Regular RCA

Type of Request: Financial Authorization

Project ID (if applicable): 15104MF0D701
Vendor/Entity Legal Name (if applicable): Not Applicable

MWBE Contracted Goal (if applicable): Not Applicable
MWBE Current Participation (if applicable): Not Applicable
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): Not Applicable
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to purchase a certain tract for a negotiated price for Harris County for the public project known as North Eldridge Parkway - from Spring Cypress Road to Gregson Road - 2015, tract number 2, for $750,000.00 which is $53,040.00 over the appraised value, UPIN 15104MF0D701, Precinct 3.
end

Background and Discussion:
North Eldridge Parkway from north of Spring Cypress Road to south of Gregson Road a Standard 4-lane concrete boulevard in 100-foot ROW with 32-foot raised median and underground storm sewer system. The southern project limit at Spring Cypress Road requires extending the southbound left turn lane to the standard 250 feet. Include median openings and left turn lanes with 100 feet of storage at Lakewood Hills Drive, Randy Riley Way, and Treetop Hills Lane. North Eldridge Parkway at Gregson Road, A Traffic Signal Warrant Study (TSWS) was conducted in 2015 and a signal is warranted. Design a mast arm signal with related pedestrian appurtenances and include 150 feet of storage in both left turn lanes. Construct a 5-foot-wide sidewalk along the North Eldridge Parkway west ROW from Spring Cypress Road to the existing sidewalk approximately 280 feet south of West...

Click here for full text