Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job. No. 23/0061, UPIN 19104MF13X01
Vendor/Entity Legal Name (if applicable): Icon GC, LLC
MWBE Contracted Goal (if applicable): 30%
MWBE Current Participation (if applicable): 28.81%
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Icon GC, LLC, in connection with final construction of Forest Shadows Subdivision Drainage Improvements 2018, adding 32 calendar days, with an addition in the amount of $77,028.15, Job No. 23/0061-2, UPIN 19104MF13X01, Precinct 3, MWBE Contracted Goal: 30%, MWBE Current Participation: 28.81%.
end
Background and Discussion:
The Forest Shadows Subdivision is located in North Harris County, north of FM 1960, east of Rayford Road, and southwest of Cypress Creek. The subdivision is within the Cypress Creek Watershed. The Forest Shadows subdivision is currently drained by roadside ditches and culverts. A portion of the drainage is directed to Theiss Road at the intersection of Forest Glade Drive and eventually through the adjacent subdivision. The southeast portion drains to Turkey Creek. The scope of work for this project consists of regrading roadside ditches, replacing culverts and driveways, construction of a detention basin for mitigation, and roadway improvements consisting of extending Broadmark Lane to provide access to the detention pond and the reconstruction of segments of Theiss Road, Forest Glade Drive and Broadmark Lane.
The change in contract incl...
Click here for full text