Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: County Engineer
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 24/0084, UPIN 22102MF2G801
Vendor/Entity Legal Name (if applicable): Environmental Allies, Inc.
MWBE Contracted Goal (if applicable): 28.35%
MWBE Current Participation (if applicable): 2.30%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Environmental Allies, Inc., in connection with Intersection Improvement - Vickery Street at Lauder Road - 2021, with an addition in the amount of $3,552.00, Job No. 24/0084-1, UPIN 22102MF2G801, Precinct 2, MWBE Contracted Goal: 28.35%, MWBE Current Participation: 2.30%.
end
Background and Discussion:
The project includes construction of intersection improvement for Vickery Street at Lauder Road. The proposed improvements include alignment of the intersection of Vickery Street at Lauder Road, widening of the roads in all directions to construct turn lanes, full width concrete replacement along Vickery Street, and a traffic signal. Additional improvements include the construction of sidewalk, ADA ramps, and bus pads.
The removal of a streetlight was necessary to facilitate the re-alignment of the intersection within the project area. The existing streetlight conflicted with the planned re-alignment and needed to be removed to ensure proper layout and alignment according to design specifications. This change in contract will add additional amount of $3,552.00 with no additional calendar days.
Expected Impact:
Increase th...