Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): UPIN 19101MF14P02
Vendor/Entity Legal Name (if applicable): IDS Engineering Group, Inc.
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: 0% - Non-Divisible
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with IDS Engineering Group, Inc. in the amount of $114,305.00 for Construction Phase Services in connection with Parkway Forest Subdivision Drainage Improvements - 2018 (P122), UPIN 19101MF14P02, Precinct 1.
end
Background and Discussion:
Parkway Forest is in Northeast Harris County, Texas, Precinct 1. The subdivision is mainly composed of single-family homes. The residents have experienced structural flooding during several recent flood events. The proposed solution includes upgrading the storm sewer system and adding a detention basin.
Expected Impact:
This project seeks to reduce flooding and strengthen resiliency in Harris County, by assisting in the alleviation of structural flood damage to homes in the community. No impact on project schedule or cost anticipated.
Alternative Options:
If no action is taken, the engineer of record will not be accessible for support through the construction of the project.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: N/A
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): N/A
Economy Initi...
Click here for full text