Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): UPIN - 23103MF2RP01; 24/0224
Vendor/Entity Legal Name (if applicable): B2Z Engineering LLC
MWBE Contracted Goal (if applicable): 100% - SBE/WBE/DBE/MBE/SDB
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with B2Z Engineering LLC in the amount of $69,578.00 for Professional Engineering Services regarding Construction Materials Testing and related Services for Sidewalk projects - N. Eldridge Pkwy - 2022, UPIN 23103MF2RP01, Precinct 3, MWBE Contracted Goal: 100%.
end
Background and Discussion:
This project contains a 5' wide concrete sidewalk along N. Eldridge Pkwy and West Rd near Hargove Elementary School. The project is funded through CDBG grant by HCD. This project consists of furnishing all materials, labor, supervision, equipment, and incidentals to construct 5-foot-wide concrete sidewalks. Items of work include, but are not limited to, roadway excavation, removal & relocation of signs, removal of existing concrete pavement, concrete driveways, curb ramp, concrete curb, guardrail, traffic control, site restoration and clean-up. All work shall be performed in accordance with the specifications, construction drawings, any applicable local, state and federal codes, ordinances and regulations. All pedestrian facilities shall be ADA compliant. This project will be federally funded by the U.S. Housing and Urban Development Department (HUD) thr...
Click here for full text