Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV-SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Negotiation
Project ID (if applicable): UPIN 24208MF36G01; Job No. 24/0374
Vendor/Entity Legal Name (if applicable): Atser, LP
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to negotiate with Atser, LP for Professional Engineering Services regarding Construction Material Testing and related Services for Asphalt Package 2024-1, UPIN 24208MF36G01, Precinct 3.
end
Background and Discussion:
Asphaltic concrete and subgrade rehabilitation of various roads throughout Harris County Precinct 3 including but not limited to Crosby Lynchburg Road, Main Street from I-10 to Thorn Street Northside (2.5 Miles), Plum Grove Road from East of FM 1485, Westbound Right Hand Turn Lane to Liberty County line (2.25 Miles).
Expected Impact:
This agreement will allow the firm to conduct field and laboratory testing on soil, concrete, asphalt and various other construction materials to ensure the material's compliance with Harris County Engineering Department's adopted standards and specifications as required by state law.
Alternative Options:
Construction materials testing is required by state law. Thus, alternatives include issuing a purchase order for similar services to a different vendor or cancelling this construction project.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic ...