Primary Department: County Engineer
Primary Department Head/Elected Official: Dr. Milton Rahman, Ph.D, P.E, PMP, CFM, ENV-SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official:
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): 23/0435
Vendor/Entity Legal Name (if applicable): Frost Construction Co. Inc
MWBE Contracted Goal (if applicable): 20%
MWBE Current Participation (if applicable): 18.01%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Frost Construction Co Inc., in connection with Deussen Park Maintenance Barn Renovation - 2022, with an addition in the amount of $23,095.85, Job No. 23/0435-3, UPIN 22101MF26401, Precinct 1, MWBE Contracted Goal: 20%, MWBE Current Participation: 18.01%.
end
Background and Discussion:
Existing parks maintenance facility consisting of two (2) steel buildings on concrete pads erected in about 1970's. One of the buildings has severe deterioration to the structural framing occurring at the base of the rigid steel frame. Existing office staff amenities of breakroom and restrooms are outdated and in poor condition. Asbestos has been identified in the facility and needs to be addressed. The site condition has ponding issues with stagnate water after rainfall.
Changes included here involve: Adding electrical motors to newly installed overhead doors at the facility, per Owner request. This feature was not originally included in the project's base bid.
Expected Impact:
These changes allow the contractor to bill for required changes resulting from unforeseen conditions and Owner Requests.
Alternative Options:
Should we not move forward with this change in contract, these ...