File #: 25-0089    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 12/22/2024 In control: Commissioners Court
On agenda: 1/9/2025 Final action: 1/9/2025
Title: Request for approval of a change in contract with Frost Construction Co Inc., in connection with Deussen Park Maintenance Barn Renovation - 2022, with an addition in the amount of $23,095.85, Job No. 23/0435-3, UPIN 22101MF26401, Precinct 1, MWBE Contracted Goal: 20%, MWBE Current Participation: 18.01%.
Sponsors: Mony Hossain
Primary Department: County Engineer
Primary Department Head/Elected Official: Dr. Milton Rahman, Ph.D, P.E, PMP, CFM, ENV-SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official:

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): 23/0435
Vendor/Entity Legal Name (if applicable): Frost Construction Co. Inc

MWBE Contracted Goal (if applicable): 20%
MWBE Current Participation (if applicable): 18.01%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Frost Construction Co Inc., in connection with Deussen Park Maintenance Barn Renovation - 2022, with an addition in the amount of $23,095.85, Job No. 23/0435-3, UPIN 22101MF26401, Precinct 1, MWBE Contracted Goal: 20%, MWBE Current Participation: 18.01%.
end

Background and Discussion:
Existing parks maintenance facility consisting of two (2) steel buildings on concrete pads erected in about 1970's. One of the buildings has severe deterioration to the structural framing occurring at the base of the rigid steel frame. Existing office staff amenities of breakroom and restrooms are outdated and in poor condition. Asbestos has been identified in the facility and needs to be addressed. The site condition has ponding issues with stagnate water after rainfall.

Changes included here involve: Adding electrical motors to newly installed overhead doors at the facility, per Owner request. This feature was not originally included in the project's base bid.

Expected Impact:
These changes allow the contractor to bill for required changes resulting from unforeseen conditions and Owner Requests.

Alternative Options:
Should we not move forward with this change in contract, these ...