Legislation Details

File #: 25-0070    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 12/22/2024 In control: Commissioners Court
On agenda: 1/9/2025 Final action: 1/9/2025
Title: Request for approval of a change in contract with John Reed and Company, LLC, in connection with Brays Bayou Pedestrian/Bike Bridge near Stella Link/Glen Arbor, adding 10 calendar days, with no change in the amount, Job No. 23/0286-2, UPIN 19101MF0XZ01, Precinct 1, Justification for 0% MWBE Participation Goal: 0% - Non-Divisible.
Sponsors: Mony Hossain
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): Job No: 23/0286, UPIN 19101MF0XZ01
Vendor/Entity Legal Name (if applicable): John Reed and Company, LLC

MWBE Contracted Goal (if applicable): 0%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: 0% - Non-Divisible

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of a change in contract with John Reed and Company, LLC, in connection with Brays Bayou Pedestrian/Bike Bridge near Stella Link/Glen Arbor, adding 10 calendar days, with no change in the amount, Job No. 23/0286-2, UPIN 19101MF0XZ01, Precinct 1, Justification for 0% MWBE Participation Goal: 0% - Non-Divisible.
end

Background and Discussion:
The project is to construct a pedestrian bridge over Brays Bayou to connect the pedestrian facilities from North Braeswood Boulevard to South Braeswood Boulevard, East of Stella Link Road. The bridge has 3-spans with 226 feet length and approximate 400 feet ramps.

The contractor is requesting 10 additional calendar days due to the impact of Hurricane Beryl from July 8, 2024, to July 17, 2024. Days are needed due the inability to work due to no electricity, inability of workers to travel to work, and inability to obtain scaffolding equipment from scaffolding company due to ne electricity at scaffold company's office and yard.

Expected Impact:
Provide safe pedestrian and cyclist crossing over Brays Bayou between North Braeswood Blvd to South Braeswood Blvd.


Alternative Options:
N/A

County Strategic Plan Goal: 2. Connect our community with safe, reli...