Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 22/0369, UPIN 18104MF0R901
Vendor/Entity Legal Name (if applicable): SER Construction Partners, LLC
MWBE Contracted Goal (if applicable): 27%
MWBE Current Participation (if applicable): 49.76%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with SER Construction Partners, LLC, in connection with Holderrieth Road Drainage Improvements Project, with an addition in the amount of $58,664.19, Job No. 22/0369-15, UPIN 18104MF0R901, Precinct 3, MWBE Contracted Goal: 27%, MWBE Current Participation: 49.76%.
end
Background and Discussion:
This project includes the reconstruction of Holderrieth Road from State Highway 249 to 850 feet west of Hufsmith-Kohrville Road. Reconstruction includes an upgrade of the roadway from a two-lane asphalt road with open ditches to a 4-lane concrete curb and gutter boulevard with a 32-foot raised median.
Temporary modification to the traffic signal was required to allow for the signal heads to better align with the traffic pattern. Also, the proposed solution of removing and relocating of fence will eliminate the installation of extended curb and 6" sidewalk. This change will save significant amount to Harris County. This change order is intended to compensate the contractor for the additional work.
New Items
TEMPORARY SIGNAL MODIFICATION AT SH249 (LS) $12,173.06
REMOVE AND REPLACE EXISTING FENCE (LS) $46,491.13
Expected Impact:
Thi...
Click here for full text