Title: Request for approval of a Study Report prepared by Woolpert, Inc, for Ralston Acres Subdivision Drainage Improvements-2018, UPIN 19101MF16P01, Precinct 1.
Sponsors: Mony Hossain
Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Report

Project ID (if applicable): UPIN 19101MF16P01
Vendor/Entity Legal Name (if applicable): Woolpert, Inc

MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request

Request Summary (Agenda Caption):
title
Request for approval of a Study Report prepared by Woolpert, Inc, for Ralston Acres Subdivision Drainage Improvements-2018, UPIN 19101MF16P01, Precinct 1.
end

Background and Discussion:
Ralston Acres is in northeast Harris County, Precinct 1. The project site is generally bounded by Greens Bayou (P100-00-00) to the west, Spicewood Ln to the north, CE King Parkway to the east and the Beaumont Freeway (Business US 90) to the south. The Ralston Acres subdivision currently includes a mix of single-family and mobile homes on lots ranging between one and two acres as well as commercial and industrial properties near John Ralston Rd. The local drainage system is composed of roadside ditches less than two feet deep and driveways culverts. Proposed improvements include an upgraded storm sewer system and two detention basins.

Expected Impact:
This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the Ralston Acres community. No impact on project schedule or cost anticipated.

Alternative Options:
The County could elect to approve the requested task or choose to reject it. However, if not approved, the project may not be constructed as scoped.

Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
X Transportation
X Flooding
_ Environment
_ Governance and Customer Service