File #: 24-7618    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 11/26/2024 In control: Commissioners Court
On agenda: 12/10/2024 Final action: 12/10/2024
Title: Request for approval to execute an agreement with MBCO Engineering, LLC in the amount of $1,220,786.25 for Professional Engineering Services in connection with Stockdick School Road - from Porter Road to Peek Road - 2023, UPIN 24104MF3A101, Precinct 4, MWDBE Contracted Goal: 19.60%, MWDBE Current Participation: 85.68%.
Sponsors: Mony Hossain
Attachments: 1. 24-7618-Award-UPIN 24104MF3A101-PSA-Stockdick School Road-MBCO Engineering-P4-12-10-2024-v02
Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

Project ID (if applicable): 24104MF3A101
Vendor/Entity Legal Name (if applicable): MBCO Engineering, LLC

MWDBE Contracted Goal (if applicable): 19.60%
MWDBE Current Participation (if applicable): 85.68%
Justification for 0% MWDBE Participation Goal: N/A - Goal is not 0% and is listed above

Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with MBCO Engineering, LLC in the amount of $1,220,786.25 for Professional Engineering Services in connection with Stockdick School Road - from Porter Road to Peek Road - 2023, UPIN 24104MF3A101, Precinct 4, MWDBE Contracted Goal: 19.60%, MWDBE Current Participation: 85.68%.
end

Background and Discussion:
The County seeks to retain MBCO Engineering, LLC to conduct the study and design for upgrading the existing Stockdick School Road from 2-lane asphalt pavement with roadside ditches to a 4-lane concrete boulevard with medians, underground storm sewer, and sidewalks on both sides. The project includes the study and design of 2 new traffic signals at the intersections of Stockdick School Road with Peek Road and Porter Road.

Expected Impact:
The project will upgrade the 2-lane asphalt roadway to a major 4-lane concrete throughfare and will expand the capacity of the roadway to handle the demands of the current and future traffic volumes. The improvements will alleviate congestion, reduce delays, and provide safe mobility for residents, pedestrians, and drivers in Northwest Katy. The project will provide safe crossing for students at Patricia Paetow High School and Stockdick Junior High School.

Alternative Options:
If not approved, the residents and road users will not benefit from the mobility improvements in their area.

Alignment with Goal(s):
X Justice and Safety