Department: Toll Road Authority
Department Head/Elected Official: Roberto Trevi?o, P.E., Executive Director
Regular or Supplemental RCA: Regular RCA
Type of Request: Proposals/Bids
Project ID (if applicable): 240411
Vendor/Entity Legal Name (if applicable): N/A
MWDBE Contracted Goal (if applicable): 14.21%
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal is not 0% and is listed above
Request Summary (Agenda Caption):
title
Request for approval to advertise for low-bid construction award for Heavy Highway, Bridge and Drainage (240411) (Countywide, MWDBE Contracted Goal: 14.21%).
end
Background and Discussion:
This request is for a capital maintenance contract to perform multiple maintenance projects on the HCTRA system. Projects included in the scope were identified by the annual system inspection as well as by HCTRA Maintenance personnel. The expected construction duration is 18 months.
This project was originally approved for advertisement May 7, 2024; however, the advertisement received no bids.
Expected Impact:
This advertisement and eventual construction contract will provide the improvements necessary to maintain the HCTRA roadway and facilities that helps ensure that the toll road system provides reliable and safe transportation to the traveling public.
Alternative Options:
No other recommended solutions for this identified need.
Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
X Transportation
_ Flooding
_ Environment
_ Governance and Customer Service
Prior Court Action (if any):
Date
Agenda Item #
Action Taken
5/7/2024
119
Approval to Advertise for Construction (no bids received)
Location:
Address (if applicable): N/A
Precinct(s): Countywide
Fiscal and Personnel Summary
Service Name
Roadway & Infrastructure Maintenance
Current Fiscal Year Cost
Annual Fiscal Cost
Labor
Non-Labor
Total
Recurring Expenses
Funding Sources
Existing...