Legislation Details

File #: 24-7489    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 11/24/2024 In control: Commissioners Court
On agenda: 12/10/2024 Final action: 12/10/2024
Title: Request for approval of a change in contract with Texas Materials Group, Inc, in connection with Maintenance - BS2N Wade North -2023, adding 60 calendar days, with an addition in the amount of $792,035.50, Job No. 23/0344-1, UPIN 23102MF2U101, Precinct 2, MWDBE Contracted Goal: 34%, MWDBE Current Participation: 48.67%.
Sponsors: Mony Hossain
Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): Job No. 23/0344, UPIN 23102MF2U101
Vendor/Entity Legal Name (if applicable): Texas Materials Group, Inc.

MWDBE Contracted Goal (if applicable): 34%
MWDBE Current Participation (if applicable): 48.67%
Justification for 0% MWDBE Participation Goal: N/A - Goal is not 0% and is listed above

Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Texas Materials Group, Inc, in connection with Maintenance - BS2N Wade North -2023, adding 60 calendar days, with an addition in the amount of $792,035.50, Job No. 23/0344-1, UPIN 23102MF2U101, Precinct 2, MWDBE Contracted Goal: 34%, MWDBE Current Participation: 48.67%.
end

Background and Discussion:
Repair of various roads in the Wade North area for the BetterStreets2Neighborhoods Community Program for Harris County Precinct 2.

This change order includes the following:
- Due to the current condition of the roads, it has been determined that an additional road needs to be replaced. This change order is necessary to ensure safety and maintain infrastructure integrity. This change order will add 45 days and additional cost of $744,700.05.
- It has been observed that the current elevation of the driveways is lower than the road elevation, which will likely cause water to pool during rainfall. To address this issue and ensure proper drainage, it has been determined that the driveways will need to be rebuilt. This adjustment is necessary to prevent potential water accumulation and maintain the longevity of the roadway. This change will add 15 days and additional cost of $47,335.45.

Expected Impact:
Increase the contract amount and adding additional days.

Alternative Options:
No action will result in substandard construction.

Alignment with Goal(s):
_...