File #: 24-7488    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 11/24/2024 In control: Commissioners Court
On agenda: 12/10/2024 Final action: 12/10/2024
Title: Request for approval of a change in contract with Texas Materials Group, Inc, in connection with Maintenance - BS2N Wade North -2023, adding 60 calendar days, with an addition in the amount of $512,794.20, Job No. 23/0344-2, UPIN 23102MF2U101, Precinct 2, MWDBE Contracted Goal: 34%, MWDBE Current Participation: 48.67%.
Sponsors: Mony Hossain
Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): Job No. 23/0344, UPIN 23102MF2U101
Vendor/Entity Legal Name (if applicable): Texas Materials Group, Inc.

MWDBE Contracted Goal (if applicable): 34%
MWDBE Current Participation (if applicable): 48.67%
Justification for 0% MWDBE Participation Goal: N/A - Goal is not 0% and is listed above

Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Texas Materials Group, Inc, in connection with Maintenance - BS2N Wade North -2023, adding 60 calendar days, with an addition in the amount of $512,794.20, Job No. 23/0344-2, UPIN 23102MF2U101, Precinct 2, MWDBE Contracted Goal: 34%, MWDBE Current Participation: 48.67%.
end

Background and Discussion:
Repair of various roads in the Wade North area for the BetterStreets2Neighborhoods Community Program for Harris County Precinct 2.

Increase the depth of Cement Stabilized Subgrade (CSS) from 6 inches to 8 inches, and the thickness of full depth concrete pavement from 8 inches to 10 inches. This adjustment will provide additional structural support, ensuring the pavement can better withstand the stresses imposed by heavy commercial loads and reduce the likelihood of future repairs or failures. This change will add additional amount of $512,794.02, and additional 60 calendar days.

Expected Impact:
Increase the contract amount and adding additional days.

Alternative Options:
No action will result in substandard construction.

Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
x Transportation
_ Flooding
_ Environment
_ Governance and Customer Service

Prior Court Action (if any):
Date
Agenda Item #
Action Taken
10/31/2023
23-6460
Contract Award

Location:
Address (if applicable):
Precinct(s): Precinct 2