Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 24/0018, UPIN 22102MF28U02
Vendor/Entity Legal Name (if applicable): D & W Contractors, Inc.
MWDBE Contracted Goal (if applicable): 26%
MWDBE Current Participation (if applicable): 49.95%
Justification for 0% MWDBE Participation Goal: N/A - Goal is not 0% and is listed above
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with D & W Contractors, Inc., in connection with Sidewalk - Woodforest Boulevard Phase II - 2022, with an addition in the amount of $1,809.00, Job No. 24/0018-3, UPIN 22102MF28U02, Precinct 2, MWDBE Contracted Goal: 26%, MWDBE Current Participation: 49.95%.
end
Background and Discussion:
This project consists of the construction of approximately 11,400 linear feet of 6-foot-wide sidewalks along north and south Woodforest Boulevard. The project limits are from Redstone Street to Freeport Street.
Additional curb installations were necessary at multiple driveways along the project corridor. This measure was required to replace damaged curbs where the existing curbing had detached or "popped off," creating safety hazards. This change order will add $1,809.00 to the contract with no additional calendar days.
Expected Impact:
Increase the cost of the contract.
Alternative Options:
No action will result in substandard construction.
Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
x Transportation
_ Flooding
_ Environment
_ Governance and Customer Service
Prior Court Action (if any):
Date
Agenda Item #
Action Taken
03/26/2024
24-1859
Contract Award
Location:
Address (if applicable):
Precinct(s): Precinct 2
Fiscal and Personnel Summary
Service Name
Engineering
Current Fiscal Year Cost
Annual Fiscal Cost
Labor
N...
Click here for full text