Legislation Details

File #: 24-7431    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 11/22/2024 In control: Commissioners Court
On agenda: 12/10/2024 Final action: 12/10/2024
Title: Request for approval to execute an agreement with Lockwood, Andrews & Newnam, Inc., in the amount of $402,000.00 for Professional Engineering Services in connection with Subdivision Reconstruction - Patiowoods - 2024, UPIN 24208MF3FA01, Precinct 3, MWDBE Contracted Goal: 19.6%.
Attachments: 1. 24-7431-Award-UPIN 24208MF3FA01-PSA-Patiowoods-LAN-P3-v01
Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

Project ID (if applicable): UPIN 24208MF3FA01
Vendor/Entity Legal Name (if applicable): Lockwood, Andrews & Newnam, Inc

MWDBE Contracted Goal (if applicable): 19.6%
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request

Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with Lockwood, Andrews & Newnam, Inc., in the amount of $402,000.00 for Professional Engineering Services in connection with Subdivision Reconstruction - Patiowoods - 2024, UPIN 24208MF3FA01, Precinct 3, MWDBE Contracted Goal: 19.6%.
end

Background and Discussion:
Harris County Engineering Department (HCED) received a request from Precinct 3 to manage the study, design, and construction of the Patiowoods subdivision reconstruction project within Harris County. Reconstruction will provide new rigid pavement with rollover curb, possible 4' sidewalks, and appropriate drainage features. The scope of this project includes drainage analysis, preparation of street alignment and typical sections and possible 4' sidewalk, preparation of construction estimate, preparation of utility conflict list, provide exhibits/renderings for public engagement, environmental, survey, and geotechnical tasks.

Expected Impact:
To provide Precinct 3 with professional engineering study and design services for the reconstruction of Patiowoods Subdivision and annex the reconstruction of Cloister Dr. to the Precinct road log. This project is funded by the 2022 Bond.

Alternative Options:
Without this project, the annexation of the reconstructed Cloister Dr. in Patiowoods Subdivision will not be realized as requested by Precinct 3.

Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
...

Click here for full text