Legislation Details

File #: 24-6959    Version: 1 Name:
Type: Grant Status: Passed
File created: 10/21/2024 In control: Commissioners Court
On agenda: 10/29/2024 Final action: 10/29/2024
Title: Request by the Flood Control District for approval to accept from the Environmental Protection Agency grant funds in the amount of $1,600,000, with a required cash match of $400,000, for the Taylor Gully Channel Conveyance Improvements and Woodridge Stormwater Detention Basin (San Jacinto River Watershed, Bond ID F-14, Project ID G103-80-03.1-E001, Precinct 3).
Attachments: 1. 24-6959
Department: Flood Control District
Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

Regular or Supplemental RCA: Regular RCA

Type of Request: Grant

Project ID (if applicable): G103-38-00-E001
Vendor/Entity Legal Name (if applicable): Environmental Protection Agency

MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request

Request Summary (Agenda Caption):
title
Request by the Flood Control District for approval to accept from the Environmental Protection Agency grant funds in the amount of $1,600,000, with a required cash match of $400,000, for the Taylor Gully Channel Conveyance Improvements and Woodridge Stormwater Detention Basin (San Jacinto River Watershed, Bond ID F-14, Project ID G103-80-03.1-E001, Precinct 3).
end

Background and Discussion:
It is recommended that the Flood Control District be authorized to accept grant award funds from the Environmental Protection Agency (EPA) Fiscal Year 2022 Clean Water STAG (Congressionally Directed) Grant Program to fund the design of the Taylor Gully Channel Conveyance Improvements and Woodridge Stormwater Detention Basin Project (G103-80-03.1-E001) in the San Jacinto River Watershed. This project was submitted by Congressman Dan Crenshaw, representing the 2nd Congressional District of Texas.
The proposed G103-80-03.1-E001 Taylor Gully Channel Conveyance Improvements and Woodridge Stormwater Detention Basin project will further reduce riverine flood risk in the San Jacinto River Watershed. The Flood Control District plans to source the required local cash match ($400,000) from the Bond Program.

Expected Impact:
The proposed Taylor Gully Channel Conveyance Improvements and Woodridge Stormwater Detention Basin project will further reduce riverine flood risk for residents of the Elm Grove, Mills Branch, North Kingwood Forest, and Woodstream Village subdivisio...