Department: Flood Control District
Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director
Regular or Supplemental RCA: Regular RCA
Type of Request: Interlocal Agreement
Project ID (if applicable): N/A
Vendor/Entity Legal Name (if applicable): Willow Fork Drainage District
MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request
Request Summary (Agenda Caption):
title
Request for approval of an interlocal agreement with Willow Fork Drainage District, to construct and maintain a public hiking trail on HCFCD Unit T103-00-00 from approximately 1,920 feet downstream of T103-02-00 to T103-01-00, and on HCFCD Unit T103-01-00 from the confluence with T103-00-00 to South Mason Road and construct and maintain a pedestrian bridge crossing over T103-02-00 at the confluence between T103-02-00 and T103-00 totaling approximately 1.89 miles in length (Barker Reservoir Watershed, Agreement No. 1553, Precinct 4).
end
Background and Discussion:
This interlocal agreement is to construct and maintain a public hike and bike trail along HCFCD Unit T103-00-00 from approximately 1,920 feet downstream of T103-02-00 to T103-01-00, and on HCFCD Unit T103-01-00 from the confluence with T103-00-00 to S. Mason Road, to include the addition of a pedestrian bridge crossing HCFCD Unit T103-02-00, with a combined trail length of approximately 10,000 linear feet (1.89 miles).
Expected Impact:
By entering into a hike and bike trail agreement with the (Willow Fork Drainage District) WFDD, it will allow the WFDD to construct sidewalks and features, as well as construct a pedestrian bridge, for the enjoyment of the community. It also reduces maintenance responsibilities for the District as WFDD will be responsible for the vegetation management in the agreement area.
Alternative Options:
If this interlocal agreement is not executed, WFDD will ...
Click here for full text