File #: 24-6493    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 10/2/2024 In control: Commissioners Court
On agenda: 10/8/2024 Final action: 10/8/2024
Title: Request by the Office of the Purchasing Agent for approval on the basis of highest overall evaluation and authorize negotiations with Michael Baker International, Inc. for professional engineering, support services, and construction phase services for channel improvements, stormwater detention basin, and bridge replacements for the Flood Control District, and the county, at its sole discretion, may discontinue negotiations and proceed to negotiate with the next ranking vendor(s) if unable to agree to an executable contract (240167), MWDBE Contracted Goal: 20%.
Attachments: 1. 24-6493 Supplemental Job No. 240167 Award Michael Baker International, Inc.
Department: Purchasing
Department Head/Elected Official: Paige McInnis

Regular or Supplemental RCA: Supplemental RC

Type of Request: Contract - Award

Project ID (if applicable): 240167
Vendor/Entity Legal Name (if applicable): Michael Baker International, Inc.

MWDBE Contracted Goal (if applicable): 20%
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal is not 0% and is listed above

Request Summary (Agenda Caption):
title
Request by the Office of the Purchasing Agent for approval on the basis of highest overall evaluation and authorize negotiations with Michael Baker International, Inc. for professional engineering, support services, and construction phase services for channel improvements, stormwater detention basin, and bridge replacements for the Flood Control District, and the county, at its sole discretion, may discontinue negotiations and proceed to negotiate with the next ranking vendor(s) if unable to agree to an executable contract (240167), MWDBE Contracted Goal: 20%.
end
Background and Discussion: This is a request to authorize negotiation for an agreement that will provide final design, bidding and construction phase services for C147-00-00 Channel Improvements, Stormwater Detention Basin, and Bridge Replacements - Phases 1B, 1C, 2 & 3.

Expected Impact: The project seeks to reduce flood risks and strengthen resiliency in the Sims Bayou watershed by reducing the overall water surface elevation (WSEL) by 2.8 feet based on a 100-year storm event. This also includes removal of 164 structures, 4.15 miles of roadway and 70 acres from the floodplain area.

Alternative Options: The alternative to approving this item would be select another firm, which would result in significant delays in completing this project.

Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
_ Transportation
X Flooding
_ Environment
_ Governance and Customer Service



Prior C...

Click here for full text