Legislation Details

File #: 24-6092    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 9/23/2024 In control: Commissioners Court
On agenda: 10/8/2024 Final action: 10/8/2024
Title: Request for approval to execute an amendment with Ally General Solutions, LLC in the amount of $22,705.00 for additional services in connection with the rebuild traffic signal at the intersection of Cypresswood Drive at Cutten Road and Schroeder Road, UPIN 23103MF2TK01, Precinct 3, MWDBE Contracted Goal: 20%, MWDBE Current Participation: 100%.
Attachments: 1. 24-6092-CIC-UPIN_24103MF3KP01-Ally Genaral - Cypresswood at Cutten and Schroeder
Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD., P.E., PMP, CFM, ENV SP, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): 23103MF2TK01
Vendor/Entity Legal Name (if applicable): Ally General Solutions, LLC

MWDBE Contracted Goal (if applicable): 20%
MWDBE Current Participation (if applicable): 100%
Justification for 0% MWDBE Participation Goal: N/A - Goal is not 0% and is listed above

Request Summary (Agenda Caption):
title
Request for approval to execute an amendment with Ally General Solutions, LLC in the amount of $22,705.00 for additional services in connection with the rebuild traffic signal at the intersection of Cypresswood Drive at Cutten Road and Schroeder Road, UPIN 23103MF2TK01, Precinct 3, MWDBE Contracted Goal: 20%, MWDBE Current Participation: 100%.
end

Background and Discussion:
Traffic signals are installed to improve the operation of an intersection and better facilitate pedestrian activities. Due to the pipeline in the area, additional SUE Level A service is required to allow for accurate locations of the existing pipelines for appropriate design of the rebuild signal at the intersection.

Expected Impact:
The installation of the rebuild traffic signal should improve the operation of the intersection. Should the additional SUE Level A service not proceed, design may not be approved by impacted pipelines in the intersection.

Alternative Options:
Subsurface utility engineering will allow for accurate location of existing utilities that are impacting the subjected location. One alternative option is to proceed with proposed design with existing information from already provided survey. However, this is not recommended as current survey does not provide the required accurate location as required for pipeline review and approval.