Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 23/0042 - UPIN 19102MF15W01
Vendor/Entity Legal Name (if applicable): Serco Construction Group, Ltd.
MWDBE Contracted Goal (if applicable): 26%
MWDBE Current Participation (if applicable): 100%
Justification for 0% MWDBE Participation Goal: N/A - Goal is not 0% and is listed above
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Serco Construction Group, Ltd., in connection with Cedar Bayou Park East and West Subdivision Drainage Improvements, with an addition in the amount of $14,967.86, Job No. 23/0042-2, UPIN 19102MF15W01, Precinct 2, MWDBE Contracted Goal: 26%, MWDBE Current Participation: 100%.
end
Background and Discussion:
The Cedar Bayou Park East and West Subdivision Drainage Improvements project site consists of subdivision drainage improvements and stormwater detention basin located south of IH 10 from Sjolander Road to Bayou
Boulevard, in east Harris County; discharging into HCFCD Channels Q113-00-00 and Q114-00-00. Major work
activities include approximately 25,300 linear feet of reinforced concrete storm sewer consisting of various reinforced concrete pipe sizes, reinforced concrete box sizes, inlets, manholes, junction boxes, culvert headwall/wingwall structures, removal and reconstruction of existing driveways and proposed detention pond.
The Change in contract request includes added quantities for the following:
Quantity Overruns - Added (1 Each) to Item No. 11 - Remove Existing Wooden Pedestrian Bridges with an additional cost of $5,470.00, added (24 Linear Feet) to Item No. 71 - 24-Inch Corrugated Metal Pipe with an additional cost of $1,802.40, added (18 Square Yards) to Item No. 76 - Geotextiles For All Weather Access Road with an additional cost of $92.70,...