Title: Request for approval to execute an amendment with BGE, Inc., in the amount of $186,670.00 for Professional Engineering Services in connection with Cedar Bayou Park East and West Subdivision Drainage Improvements - 2018, UPIN 19102MF15W01, Precinct 2, Justification for 0% MWDBE Participation Goal: N/A - project was awarded prior to launch of County's M/WBE Program.
Sponsors: Mony Hossain
Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): UPIN 19102MF15W01
Vendor/Entity Legal Name (if applicable): BGE, Inc.

MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - project was awarded prior to launch of County's M/WBE Program

Request Summary (Agenda Caption):
title
Request for approval to execute an amendment with BGE, Inc., in the amount of $186,670.00 for Professional Engineering Services in connection with Cedar Bayou Park East and West Subdivision Drainage Improvements - 2018, UPIN 19102MF15W01, Precinct 2, Justification for 0% MWDBE Participation Goal: N/A - project was awarded prior to launch of County's M/WBE Program.
end

Background and Discussion:
The project is located in Baytown, TX, approximately 1.2 miles south of Interstate Highway 10 and 0.1 miles west of the Harris County line. Cedar Bayou Park East and West drains by roadside ditches with some intermittent storm sewers. The major drainage system collector is Harris County Flood Control District (HCFCD) channel Q13-00-00 which drains the neighborhood from Sjolander to the outfall location at Bayou Boulevard. The proposed improvements in the subdivision are to regrade roadside ditches, install storm sewer beneath ditches, construct driveways and driveway culverts, and construct a storm water detention basin. This amendment is required for design and drainage changes that are required for restoration of the drainage features installed during construction.

Expected Impact:
This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the Cedar Bayou subdivision. This amendment will add an additional budget to the project....