Legislation Details

File #: 24-5071    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 8/13/2024 In control: Commissioners Court
On agenda: 8/27/2024 Final action: 8/27/2024
Title: Request for approval of a change in contract with Serco Construction Group, Ltd., in connection with Cedar Bayou Park East and West Subdivision Drainage Improvements, with an addition in the amount of $440,578.90, Job No. 23/0042-3, UPIN 19102MF15W01, Precinct 2, MWDBE Contracted Goal: 26%, MWDBE Current Participation: 100%.
Sponsors: Mony Hossain
Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): Job No. 23/0042 - UPIN 19102MF15W01
Vendor/Entity Legal Name (if applicable): Serco Construction Group, Ltd.

MWDBE Contracted Goal (if applicable): 26%
MWDBE Current Participation (if applicable): 100%
Justification for 0% MWDBE Participation Goal: N/A - Goal is not 0% and is listed above

Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Serco Construction Group, Ltd., in connection with Cedar Bayou Park East and West Subdivision Drainage Improvements, with an addition in the amount of $440,578.90, Job No. 23/0042-3, UPIN 19102MF15W01, Precinct 2, MWDBE Contracted Goal: 26%, MWDBE Current Participation: 100%.
end

Background and Discussion:
The Cedar Bayou Park East and West Subdivision Drainage Improvements project site consists of subdivision drainage improvements and stormwater detention basin located south of IH 10 from Sjolander Road to Bayou
Boulevard, in east Harris County; discharging into HCFCD Channels Q113-00-00 and Q114-00-00. Major work
activities include approximately 25,300 linear feet of reinforced concrete storm sewer consisting of various reinforced concrete pipe sizes, reinforced concrete box sizes, inlets, manholes, junction boxes, culvert headwall/wingwall structures, removal and reconstruction of existing driveways and proposed detention pond.

The Change in contract request includes new items for the following:

* Temporary Residential Driveways - Added a new item, Temporary Residential Driveways with a quantity of 38 Each and an additional cost of $36,100.00. The original contract did not include an item for Temporary Residential Driveways.

* Quantity Overruns and New Line Items - The overruns include cubic yards used for concrete headwall structures and the use o...

Click here for full text