Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Regular or Supplemental RCA: Regular RCA
Type of Request: Negotiation
Project ID (if applicable): UPIN - 24104MF3H001
Vendor/Entity Legal Name (if applicable): Lockwood, Andrews & Newnam, Inc
MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request
Request Summary (Agenda Caption):
title
Request for approval to negotiate with Lockwood, Andrews & Newnam, Inc for the design and construction of a mast arm in connection with Traffic Signal - Boudreaux Road and Shaw Road, UPIN 24104MF3H001, Precinct 4.
end
Background and Discussion:
Traffic signals are installed to improve the operation of an intersection and better facilitate pedestrian activities. As such, the consultant will be tasked with the signal design of the intersection to improve operations. The consultant will be tasked with evaluating pedestrian accessibility through the provision of crosswalks and associated adjustments required to facilitate pedestrian activities.
Expected Impact:
This location currently operates as a minor street stop-controlled intersection. An alternative is to not signalize the intersection, which will not provide operational and pedestrian benefits.
Alternative Options:
This location currently operates as a minor street stop-controlled intersection. An alternative is to not signalize the intersection, which will not provide operational and pedestrian benefits.
Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
X Transportation
_ Flooding
_ Environment
_ Governance and Customer Service
Prior Court Action (if any):
Date
Agenda Item #
Action Taken
Location:
Address (if applicable): Boudreaux Road and Shaw Road in Cypress, Texas 77429
Precinct(s): Precinct 4
Fiscal and Personnel S...