Legislation Details

File #: 24-4547    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 7/19/2024 In control: Commissioners Court
On agenda: 8/6/2024 Final action: 8/6/2024
Title: Request for approval of a change in contract with CE Barker, Ltd. in connection with Bernadine Estates & Tower Oaks Sec 3 Subdivision Drainage Improvements - 2018 aka Bernadine Drainage Improvements Project, with an addition in the amount of $569.49, Job No. 23/0317-3, Bond Fund, UPIN 19103MF12J01, Precinct 3, MWDBE Contracted Goal: 23%, MWDBE Current Participation: 25.52%.
Sponsors: Mony Hossain
Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): Job No. 23/0317; UPIN 19103MF12J01
Vendor/Entity Legal Name (if applicable): CE Barker Ltd.

MWDBE Contracted Goal (if applicable): 23%
MWDBE Current Participation (if applicable): 25.52%
Justification for 0% MWDBE Participation Goal: N/A - Goal is not 0% and is listed above

Request Summary (Agenda Caption):
title
Request for approval of a change in contract with CE Barker, Ltd. in connection with Bernadine Estates & Tower Oaks Sec 3 Subdivision Drainage Improvements - 2018 aka Bernadine Drainage Improvements Project, with an addition in the amount of $569.49, Job No. 23/0317-3, Bond Fund, UPIN 19103MF12J01, Precinct 3, MWDBE Contracted Goal: 23%, MWDBE Current Participation: 25.52%.
end

Background and Discussion:
The project is in northwest Harris County in the White Oak Bayou watershed. Bernadine subdivision improvements consists of roadside ditches that drain into HCFCD channel E132-00-00. The scope and proposed improvements are to regrade roadside ditches, install a storm sewer system under the ditches, upsize culverts, and reconstruct roadways within the neighborhood. A detention pond will be constructed to mitigate within the project limits. Improvements will comply with Harris County standards.

The Change in contract request new items for the following:

Relocation of Electrical Pole - Added New Item "Relocate of Electrical Pole" - additional cost for $17,989.97. Reimbursement for the contractor's payment to Center Pointe Electric for the relocation of cables and electrical pole in conflict with a with the installation of the 5'X3' Reinforced Concrete Boxes and a 16 inches Force main between Station 19+64 East Morgan and the East End of the Detention Pond.

Substitute Lime/Fly ash for Cement Slurry Stabilization - Added...