Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Regular or Supplemental RCA: Regular RCA
Type of Request: Public Necessity
Project ID (if applicable): 20104MF1C401
Vendor/Entity Legal Name (if applicable): Not applicable
MWDBE Contracted Goal (if applicable): Not applicable
MWDBE Current Participation (if applicable): Not applicable
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request
Request Summary (Agenda Caption):
title
Request for approval of a certain project, decreeing the project to be a public necessity and convenience, and directing the Harris County Real Property Division to acquire eighteen (18) road easement and two (2) fee simple tracts for the public project known as Boudreaux Road Segment 3 - from Old Boudreaux Road to 300' west of Hufsmith-Kohrville Road - 2019, for the purpose of roadway construction, UPIN 20104MF1C401, Precinct 3.
end
Background and Discussion:
This project aims to design a four-lane concrete boulevard with a 32-foot raised median, underground storm sewer system, and pedestrian sidewalk within a 100-foot ROW, transitioning from an existing 14-foot median near Old Boudreaux Road. It includes strategic drainage solutions, intersection improvements, and right-of-way verifications, enhancing safety and integrating with ongoing infrastructure projects.
Expected Impact:
The project is expected to significantly enhance traffic flow, safety, and infrastructure resilience by providing a modern, well-planned boulevard with improved drainage and pedestrian facilities. It will reduce congestion, accommodate future growth, and integrate seamlessly with surrounding projects, contributing to the overall development and sustainability of the area.
Alternative Options:
If no action is taken, this intersection will continue operating under existing conditions.