Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Regular or Supplemental RCA: Regular RCA
Type of Request: Report
Project ID (if applicable): UPIN 19103MF16201
Vendor/Entity Legal Name (if applicable): HR Green, Inc.
MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - project was awarded prior to launch of County's M/WBE Program
Request Summary (Agenda Caption):
title
Request for approval of a Study Report prepared by HR Green, Inc., for Copperfield Southdown Village Sec 1 Subdivision Drainage Improvements - 2018, UPIN 19103MF16201, Precinct 3.
end
Background and Discussion:
Copperfield Southdown Village Section 1 Subdivision is located south of Longenbaugh Drive and west of Highway 6 in Precinct 3. The existing stormwater drainage system for the neighborhood consists of an underground storm sewer system with 24-inch to 48-inch reinforced concrete pipes (RCP). The system has three outfalls to HCFCD Unit No. U106-08-00. The existing system has experienced both localized flooding due overland sheet flows as well as potential regional flooding from Horsepen Creek (U106-00-00). As a result of the undersized system, the subdivision also experiences significant ponding along multiple roadways reducing access to the subdivision. The scope and proposed improvements consist of upsizing storms sewer system and constructing a basin for mitigation.
Expected Impact:
This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood in the Copperfield Southdown Village Sec 1 subdivision. No impact to project cost, schedule or staffing anticipated.
Alternative Options:
The County could elect to approve or choose to reject the study recommendations. However, if not approved, the design plans cannot be completed as recommended in the stu...