Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): UPIN - 24208MF33K01 - Job No. 23/0360
Vendor/Entity Legal Name (if applicable): Mar-Con Services, LLC
MWDBE Contracted Goal (if applicable): 24%
MWDBE Current Participation (if applicable): 100%
Justification for 0% MWDBE Participation Goal: N/A - Goal is not 0% and is listed above
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Mar-Con Services, LLC, in connection with Aldine Village (EAST) Subdivision Drainage Improvements - 2018, adding six calendar days, with an addition in the amount of $5,054.91, Job No. 23/0360-1, UPIN 24208MF33K01, Precinct 2, MWDBE Contracted Goal: 24%, MWDBE Current Participation: 100%.
end
Background and Discussion:
The location of the work is in with Aldine Village (EAST) Subdivision in the Halls Bayou Watershed. The proposed improvements include installation of new storm sewer system, roadway paving, channel construction, and driveway removal and restoration work.
The Change in contract includes the following:
* Adjustment of work items due to field conditions - Added quantities to item #3, remove and dispose old concrete (driveway) including curb and headwalls - 44.21 square yards at $39.00 per square yard for a total of $1,724.19. Added quantities to item #10, remove and dispose of existing concrete or metal pipe (all sizes and shapes) - 31 linear feet at $18.50 per linear foot for a total of $573.50. Added quantities to Item #30, reinforced concrete driveways (6", high early strength concrete) - 44.21 square yard at $77.20 per square yard for a total of $3,413.01. Added Item #56, temporary residential driveways (all sizes) - 1 each at $735.70, added new pay item #84, 30-inch reinforced concrete pipe - 32 linear feet at $180.80 per linear foot for a tot...