File #: 24-3768    Version: 1 Name:
Type: Transmittal Status: Accepted
File created: 6/13/2024 In control: Commissioners Court
On agenda: 6/25/2024 Final action: 6/25/2024
Title: Transmittal by the Flood Control District of a preliminary engineering report prepared by Civitas Engineering Group formerly KIT Professionals, Inc. and dated August 1, 2023, titled Mueschke East Stormwater Detention Basin L500-06-00-E001 Final Preliminary Engineering Report. (Little Cypress Creek Watershed, Bond ID F-29, Project ID L500-06-00-E001, Precincts 3 and 4).
Attachments: 1. 062524 TRANSMITTAL PER L500-06-00-E001 PCT 3 AND 4 backup.pdf
Department: Flood Control District
Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

Regular or Supplemental RCA: Regular RCA

Type of Request: Transmittal

Project ID (if applicable): L500-06-00-E001
Vendor/Entity Legal Name (if applicable): Civitas Engineering Group formerly KIT Professionals, Inc.

MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request

Request Summary (Agenda Caption):
title
Transmittal by the Flood Control District of a preliminary engineering report prepared by Civitas Engineering Group formerly KIT Professionals, Inc. and dated August 1, 2023, titled Mueschke East Stormwater Detention Basin L500-06-00-E001 Final Preliminary Engineering Report. (Little Cypress Creek Watershed, Bond ID F-29, Project ID L500-06-00-E001, Precincts 3 and 4).
end

Background and Discussion:
The purpose of the Preliminary Engineering Report (PER) was to examine potential design alternatives for the Mueschke East Stormwater Detention basin that will add channel and stormwater detention capacity to provide water to surface elevation reduction within the Little Cypress Creek watershed. This basin is one of nine regional stormwater detention basins that are part of the flood risk mitigation strategies of the Little Cypress Creek Frontier Program.

Expected Impact:
The acceptance of this PER will allow the Flood Control District to move into the design engineering stage of this project.

Alternative Options:
N/A

Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
_ Transportation
X Flooding
_ Environment
_ Governance and Customer Service

Prior Court Action (if any):
Date
Agenda Item #
Action Taken
1/7/2020
2.b.5
ATN
6/30/2020
2.b.13
Agreement

Location: Along L100-00-00 between Cypress Rosehill Road and Mueschke Road
Address (if applicable):
Precinct(s): Precin...