Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD., P.E., PMP, CFM, County Engineer
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): 24035MF35E01
Vendor/Entity Legal Name (if applicable): Gradient Group LLC
MWDBE Contracted Goal (if applicable): 20%
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request
Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with Gradient Group, LLC in the amount of $106,704.00 for survey, design, and construction services of a new traffic signal at the intersection of Gosling Road at Hampton Pointe Boulevard, UPIN 24035MF35E01, Precinct 3, MWDBE Contracted Goal: 20%.
end
Background and Discussion:
Traffic signals are installed to improve the operation of an intersection and better facilitate pedestrian activities. A traffic study was conducted at the intersection Gosling Road at Hampton Pointe Boulevard, warranting a traffic signal.
Expected Impact:
The installation of the new traffic signal should improve the operation of the intersection.
Alternative Options:
Intersections are evaluated in accordance with the 2011 Texas Manual on Uniform Control Devices (TMUTCD), which takes into consideration traffic volume, crashes, pedestrian activity, and the roadway network. The intersection was evaluated, and a traffic signal was warranted. One alternative option is to install a multi-way stop control at the intersection. However, this is recommended as an interim measure while arrangements are being made for the installation of a traffic signal per the TMUTCD.
Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
X Transportation
_ Flooding
_ Environment
_ Governance and Customer Service
Prior Court Action (if any):
Date
Agenda Item #
Action Taken
09/19/2023
109
ATN Approved
Location:
Addre...